FrameFirst™ Elevated Post Base Models FF44 · FF66

Frame the house now. Pour the flatwork later.

A hot-dip galvanized steel post base that sets on its own footing, so you can frame the whole structure, porch posts included, before the finished flatwork is poured.

Typical install · Stem wall and crawl space at left, FrameFirst post at right. Beauty wrap shown half cut away.
01

Frame first

Set the post on its footing, anchor it and keep framing. No waiting on flatwork to set porch posts.

02

Wood off the slab

The formed seat holds the timber 4"–6" above finish concrete, up off the slab and out of standing water.

03

Galvanized steel

Hot-dip galvanized for corrosion resistance. Sill seal foam at the post isolates it from the slab.

04

Disappears

Beauty wrap covers the steel and timber for a clean, finished column. Nobody sees the hardware.

Why FrameFirst

Stop letting the slab set the schedule

Porch and patio posts normally sit on the flatwork, so the posts wait on the concrete. FrameFirst puts the post on its own footing from day one.

The usual way

Posts wait on concrete

  • Porch posts can't go in until the finished flatwork is poured.
  • Porch roofs and beams get temporary shoring, or wait.
  • Framers come back for a return trip once the concrete cures.
  • Flatwork gets rushed to keep the framing moving.

The FrameFirst way

Frame it all, pour when ready

  • The base sets on a small footing, level with the stem wall footing.
  • Seat the timber and frame the whole structure, porch included.
  • Gravel and finish concrete go in around the post whenever the schedule allows.
  • The timber stays up off the slab, and beauty wrap hides the steel.

Frame now · Pour later · Wrap it clean

How it works

  1. Set on footing

    Set the base on a small concrete footing, top level with the stem wall footing. Anchor it with (4) 1/2" Titen HD anchors, seat the timber and frame.

  2. Add gravel

    Gravel goes in around the post. Wrap the post in 1/4" sill seal foam where it passes through the gravel and slab as an expansion/contraction barrier.

  3. Pour + beauty wrap

    Pour the finish concrete when the schedule allows. The seat stays 4"–6" above the slab, and beauty wrap hides the steel.

Same base, post and plate · Seat sized to the timber

Models & specs

FF44FrameFirst · Galvanized
4x4
FF66FrameFirst · Galvanized
6x6
FrameFirst specifications
FF44FF66
Timber4x46x6
Formed seat3/16" A36 plate U-saddle, sized for 4x43/16" A36 plate U-saddle, sized for 6x6
Base plate1/2" A36 steel, 8" × 8" (same plate on both models)
Post2-1/2" Schedule 40 steel pipe (2.875" OD)
Seat heightSeat sits about 4"–6" above the finished slab
FinishHot-dip galvanized steel
Anchorage(4) 1/2" Titen HD screw anchors through the base plate into the footing
Timber fastening(10) 1/4" × 1-1/2" SDS screws through the formed seat into the timber
At the slab1/4" sill seal foam wrap through gravel and slab (expansion/contraction barrier)

Engineering documentation available on request. Contact us for project details. Illustrations not to scale. Consult your engineer of record for project-specific design.

Drawings & downloads

See it on paper

Tap a sheet to zoom in, or download the full drawing set and brochure.

01 · Site elevationTypical install beside the house stem wall.
02 · Install sequenceFooting, gravel, then finish concrete.
03 · FF44 vs FF66Unit elevations and callouts.

Look for the orange on the jobsite

Hats and tees for the crews who frame with FrameFirst. See the orange on a jobsite? Ask how the porch posts went in before the concrete did.

Charcoal FrameFirst hat with the orange logo patch. Charcoal FrameFirst t-shirt, front. Safety orange FrameFirst t-shirt, back, reading Frame the house now. Pour the flatwork later.

Where to buy

Get FrameFirst on your next job

Pick them up at Pacific Lumber, or reach out with questions, orders or project details.

Available through

Pacific Lumber

21270 Butteville Road NE
Donald, OR
Get directions (opens Google Maps)

Questions & orders

Chris “Rudy” Rudolph

360-609-1305
rudy@sturgeon-mining.com

Made by Sturgeon Mining LLC · Camas, WA
31606 NE George Road, Camas, WA 98607
Locally made in the Pacific Northwest.

Send us a note

Tell us about your project and we'll get back to you.